Installation checklist

Invoq Combi & Invoq Hybrid

6-1/1 GN 10-1/1 GN 20-1/1 GN 6-2/1 GN 10-2/1 GN 20-2/1 GN Gas & electric

After installation

This installation checklist is part of the documentation package provided with the oven. To ensure that the oven is covered by the warranty, you must fill in the installation checklist after installation of the oven and review it with the customer. The installation checklist must be signed by both the technician and customer. Save the installation checklist. In case of warranty claims, you must be able to present the signed installation checklist on request from the warranty provider.

Customer identification

Oven identification

Levelling and securing

Stand is level
Oven is level
Roll-in trolley is level when in oven
Door closing device is checked and/or adjusted
Door seal is tight
Levelling and securing complies with the requirements stated in the installation manual

Clearance around the oven

The oven is equipped with a protection heat shield
Power consumption when using the cavity heating elements
L1
A
L2
A
L3
A
Electrical connection complies with the requirements stated in the installation manual

Water supply

Shut-off valve is present at the water connection
Installed water treatment system
Electrical connection complies with the requirements stated in the installation manual

Drain connection

Drain installation is open
Drain is located under the oven (steam is drawn into the cooling air inlet)
Additional vertical ventilation pipe installed
Stacked units have separate drain connections
Drain gradient is more than 3° or 5%
Drain connection complies with the requirements stated in the installation manual

Gas Connection

Gas type stated on the name plate complies with the supplied gas
A shut-off valve is installed at the supply line and is reachable by the user
O2% in the exhaust on lower burner is adjusted to
Min RPM
Max RPM
 
O2% in the exhaust on upper burner is adjusted to
Min RPM
Max RPM
 
O2% in the exhaust on burner for steam generator is adjusted to (Only relevant for Invoq Hybrid ovens)
Min RPM
Max RPM
 
Gas hose protection strap has been installed
Installation complies with local regulations for gas equipment
Gas connection complies with the requirements stated in the installation manual

Installation and handover

Drain connection is tight
Water connection is tight
All hoses are tight
All functions work (use the “Test” menu to test all functions)
Condensation hood is working, if any
Door is calibrated
Water counter is checked, adjusted and/or reset
Water filter alert set
Water filter size set
Customer has been instructed in the basic functions of the oven
Customer has been instructed in cleaning of the air intake filter
Customer has been instructed in the replacement of the HydroShield water filter
Customer has been instructed in where to place the CareCycle Clean tabs
Customer has been instructed in where to place the CareCycle Descale tabs
Customer has received all documents and manuals relevant to the oven
Test, installation and handover comply with the requirements stated in the installation manual
Latest software/firmware installed via supplied USB